Skip to main content
City of Hyattsville Home

Still in design phase??

From "King Park Renovation"

Go to the project

Why on earth did it close in November 2022 if we are still in the design phase? That’s an entire spring season of grabbing a coffee and watching my kids run around wasted.

Comments(2)

Commenting is not possible because this project is currently not active.
Most recent comments have loaded.
Profile of Cindy Zork
Posted by:Cindy Zork
4 years ago
Hello, there has been ongoing environmental and survey work in the park during this period. This included tree repair and root aeration, stormwater abatement measures to protect the homes behind the park from water flow, and ground penetrating radar and surveying to prepare for demolition and construction. The park needs to remain closed to allow the ground markings and temporary stormwater protections to remain in place. Demolition of the current playground equipment is expected to begin soon.
  • 1 like
Yeah, I would have loved to keep playing through the winter, since no work has happened yet.

    Share

    Posted by

    Current status

    proposed

    Tags

    Other